SS&L Architects

Quality by Design

  • Portfolio
  • About
    • About SS&L
    • Services
    • Upcoming Bids
    • Newforma
  • Team
  • Careers
    • Work With Us
    • SS&L Academy
  • News
  • Contact

Logistics Readiness Squadron Supply Complex

Completion

2024

Size

37,300 SF

Project Type

Military

SSLF35exteriors-17
SSLF35exteriors-19
SSLF35exteriors-21
SSLF35interiors-1
SSLF35interiors-14
SSLF35interiors-16
SSLF35interiors-18
SSLF35interiors-19
SSLF35interiors-20

The new Logistics Readiness Squadron Supply Complex for the Alabama Air National Guard’s 187th Fighter Wing replaces the outdated 1950s-era base supply facility, meeting the needs of modern operations. The complex includes 6,000 square feet of administrative space, featuring a Logistics and Planning area designed to comply with Secure Program Access Facilities standards.

Adjacent to the administrative area, a 26,800-square-foot warehouse provides a spacious, column-free floor plan to support Traffic Management Operations, Central Storage, and Clothing/Mobility storage needs. Along the north side of the facility, a 2,000-square-foot Hazmat pharmacy centralizes and safely accommodates hazardous material storage for the base.

A strategically placed loading dock on the east side supports deliveries, including F-35 airframe components and engine modules, with efficient offloading capabilities. Specialized storage areas address weapons and sensitive materials associated with the F-35 program, designed in alignment with Lockheed Martin’s Facilities Requirements Documents.

The complex integrates seamlessly into the base’s new pedestrian concourse, connecting it to the F-35 Flight Simulator Facility, the Main Aircraft Maintenance Hangar, the Communications Facility, the Squadron Operations building, the Aircraft Maintenance Unit, and the Weapons Load Training Facility.

Footer

Auburn Dothan Huntsville Montgomery

Copyright © 2025 · All Rights Reserved. SS&L Architects · Website by dandelion marketing, llc · Log in